    Large-scale unit commitment under uncertainty: an updated literature survey

    Get PDF
    The Unit Commitment problem in energy management aims at finding the optimal production schedule of a set of generation units, while meeting various system-wide constraints. It has always been a large-scale, non-convex, difficult problem, especially in view of the fact that, due to operational requirements, it has to be solved in an unreasonably small time for its size. Recently, growing renewable energy shares have strongly increased the level of uncertainty in the system, making the (ideal) Unit Commitment model a large-scale, non-convex and uncertain (stochastic, robust, chance-constrained) program. We provide a survey of the literature on methods for the Uncertain Unit Commitment problem, in all its variants. We start with a review of the main contributions on solution methods for the deterministic versions of the problem, focussing on those based on mathematical programming techniques that are more relevant for the uncertain versions of the problem. We then present and categorize the approaches to the latter, while providing entry points to the relevant literature on optimization under uncertainty. This is an updated version of the paper "Large-scale Unit Commitment under uncertainty: a literature survey" that appeared in 4OR 13(2), 115--171 (2015); this version has over 170 more citations, most of which appeared in the last three years, proving how fast the literature on uncertain Unit Commitment evolves, and therefore the interest in this subject

    Congestion management using demand response and FACTS devices”, Electric power and Energy Systems

    No full text
    a b s t r a c t An approach is proposed for transmission lines congestion management in a restructured market environment using a combination of demand response (DR) and flexible alternating current transmission system (FACTS) devices. To achieve this aim, a two-step market clearing procedure is formulated. In the first step, generation companies bid to the market for maximizing their profit, and the ISO clears the market based on social welfare maximization. Network constraints including those related to congestion management are represented in the second step of the market-clearing procedure. The paper develops, using mixed integer optimization technique, a re-dispatch formulation for the second step in which demand responses and FACTS device controllers are optimally coordinated with conventional generators
    corecore